Other therapy measures are as a result by rising the protective layer thickness, along with other therapy measures are thus expected.Figure 12. Service life of structures with diverse protective layer thickness and crack depth. Figure 12. Service life of structures with aadifferent protective layer thickness and crack depth.four. Treatment Measures for Structural Durability 4. Therapy Measures for Structural Durability The foregoing evaluation clearly indicates that cracks in chloride corrosion environments The foregoing analysis clearly indicates that cracks in chloride corrosion environdirectly impact the service life of a tunnel structure. Several therapy measures have ments directly impact the service life of a tunnel structure. Various therapy measures have for that reason been developed to fulfil the structural durability needs. thus been designed to fulfil the structural durability specifications. 4.1. Voids behind the Lining 4.1. Voids behind the Lining During the operation of a subway tunnel, loose locations in the surrounding rock may possibly fall During the operation of a subway tunnel, loose areas from the surrounding rock could and type a void behind the lining owing to subway automobile vibration and/or groundwater fall and form a void behind the lining owing to subway car vibration and/or groundscouring effects. This could result in lining cracks, water leakage and other structural diseases. water scouring effects. This could cause lining cracks, water leakage and also other structural To Charybdotoxin Formula address this challenge, it is actually advised to backfill the void with grout (Figure 13). illnesses. To address this dilemma, it is advised to backfill the void with grout (FigSpecifically, grouting holes could be drilled at lengths which will be adjusted in line with the ure 13). Especially, grouting holes is often drilled at lengths that can be adjusted according onsite void distribution. To ensure that the voids are densely filled, it’s essential to inject towards the onsite void distribution. To make sure that the voids are densely filled, it is essential to inject grouting components, which include traditional VBIT-4 Autophagy double slurry, chemical slurry and foam concrete, by means of the grouting holes.four.1. Voids behind the Lining For the duration of the operation of a subway tunnel, loose locations of your surrounding rock might fall and form a void behind the lining owing to subway automobile vibration and/or groundwater scouring effects. This can cause lining cracks, water leakage along with other structural 13 of 15 illnesses. To address this problem, it truly is encouraged to backfill the void with grout (Figure 13). Especially, grouting holes can be drilled at lengths that can be adjusted in accordance with the onsite void distribution. To make sure that the voids are densely filled, it’s essential grouting materials,materials, for example regular double slurry,slurry andslurry concrete, to inject grouting including traditional double slurry, chemical chemical foam and foam via the grouting holes. concrete, by way of the grouting holes.Supplies 2021, 14,Figure 13. Grouting of void behind the lining. Figure 13. Grouting of aa void behind the lining.Materials 2021, 14, x FOR PEER REVIEW4.2. Lining Surface Cracks four.2. Lining Surface Cracks For cracks on the surface of aa subway lining, a wedge-shaped groove can be14 of in For cracks around the surface of subway lining, a wedge-shaped groove may be made use of 16 used in the cracked area to cut the groove inlay therapy. Epoxy resin mortar is often injected in to the cracked region t.